What is a Provisional Sum Item?

Provisional Sum (PS) items are set aside for uncertain work or services, like excavation or foundation work, which can’t be accurately priced at contract signing due to variables like site conditions. The actual cost is determined once the scope of work is...

What is a PC (Prime Cost) item?

A PC (Prime Cost) item refers to an allowance in a construction contract for the cost of materials or products that have not been specifically chosen or specified at the time of contract signing. This allowance helps cover the cost of these items, allowing you to make...

How do I know what selections I need to make?

Knowing what selections to make for your project can feel overwhelming, but we can guide you through the process. We can team you up with our interior design consultants and they can help you choose everything, from flooring and fixtures to paint colours and...